How long does a website redesign take for a consultancy?
Key numbers
Foundation Sprint: positioning, homepage copy and build plan (VisionaryGrid)
Framework sprint for firms with settled positioning (VisionaryGrid)
Continue phase after a Flagship launch (VisionaryGrid)

A focused website redesign for a consultancy takes two to three weeks of sprint work once positioning is clear, and four to six weeks when brand strategy is included. Most delays come from the client side: content, photography and sign-off. Agree owners and dates for those before the project starts.
What does a realistic timeline look like?
Positioning and copy: 5 days. Our Foundation Sprint settles who the site is for, the homepage message and the build plan.
Focused redesign: 2 to 3 weeks. For firms whose positioning is mostly clear. Structure, copy, design and a Webflow build.
Brand and website: 4 to 6 weeks. Brand strategy and identity first, then the site. Larger engagements can run in phases, with a 90-day Continue phase after launch to tune what's live.
Why do website projects overrun?
Rarely because of design or build. The usual causes are waiting for content (team bios, case studies, photography), feedback rounds that keep reopening decisions, and new stakeholders joining late. Running the work as a fixed sprint with set review points keeps decisions moving.
Do the different scope options change the timeline?
Yes. Each extra layer adds time: brand identity work, a larger CMS such as insights or case studies, and integrations like a CRM or client portal. When comparing options, ask what each one adds to the calendar as well as the cost.
How can you speed up a redesign?
Decide who signs off before you start, gather case study material early, and book review sessions in the calendar on day one. If you have a launch date in mind, such as an event or a funding round, say so in the brief so the plan works back from it.
FAQs
Two to three weeks of sprint work when positioning is clear, and four to six weeks when brand strategy is included. Content and sign-off speed on the client side usually decide the real end date.
Late content such as bios, case studies and photography, feedback that reopens earlier decisions, and stakeholders joining part-way through. Agree owners and review dates before kick-off.
Yes. A single landing page on settled positioning can be done within a week or two. Check it fits the wider site plan so it isn't rebuilt later.
It adds two to three weeks at the front, but usually saves time overall because design and copy aren't held up by unresolved positioning questions.
At VisionaryGrid, Flagship projects include a 90-day Continue phase to track performance and refine what's live. Ongoing care is available through the monthly Visionary Partnership.
Three ways of working with us.
Foundation Sprint
The diagnosis, done properly. We find the tension, name the gap, and price what it's costing you. You leave with a positioning document and a clear view of what to build. The right starting point for founders who want to understand the problem before committing to a solution.
Framework Engine
For firms that already know what needs to change. Messaging, website, lead system, the full surface, built to match what you've actually built over the years.
Flagship 4C System
Fourteen weeks across all four stages. Ninety days of post-launch compounding. Founder-led from the first call to the final iteration. We take two of these a year because that's the only way to do it properly. Both slots are currently open.
Before you commit to anything
Not sure where to start? The 4C Growth Diagnostic takes eight minutes.
Twenty questions. A scored breakdown across all four pillars, Clarify, Craft, Convert, Continue. You will finish with a clear view of which part of your business is holding the next stage back, a priority for where to focus first, and a free resource that addresses your specific gap directly.
There is no pitch at the end. If the output is useful, you have something to act on today. If it is not, you have lost eight minutes.